ProductsSolutionsFAQContact Us

Case Study · Corporate

Case Study: Tech Campus Command Centre, Gurugram

A 24-panel LED mosaic integrated into a Fortune 500 company's AV stack — with 99.9% uptime.

Get Free Quote 📞 +91 8368 283 916
50+
Installations Delhi NCR
5 yr
Warranty (up to)
CE·UL
Certified panels
Free
Site visit & demo

A Fortune 500 company's Gurugram campus runs a round-the-clock operations command centre — network dashboards, incident feeds and status boards watched continuously by rotating teams. The display wall behind it all had to be as reliable as the operations it monitored.

24-panel LED video wall in an operations command centre

The Challenge

Command centres cannot go dark. The wall had to display 24 simultaneous sources in a flexible mosaic, integrate with the client's existing AV control system rather than replace it, and sustain continuous operation with maintenance windows measured in minutes.

The Solution

A 24-display LED video wall mosaic driven through the client's incumbent AV control stack — operators kept their existing workflows and source-switching interfaces. Redundant power and signal paths, front-serviceable panels, and hot-swappable modules keep repairs inside operational tolerances.

The Result

99.9% uptime since commissioning, with a 3-year warranty and SLA-backed service. The centre now runs its full dashboard estate on one wall — with source layouts reconfigured per shift, incident and normal-operations modes.

Free site visit across Delhi NCR — we measure, recommend the right spec, and quote on the spot. Get a free quote or WhatsApp +91 8368 283 916.

Project Specifications

ParameterSpecificationDetail
Configuration24-display mosaicFlexible multi-source layouts
IntegrationExisting AV controlNo workflow change for operators
Uptime99.9%Since commissioning
Support3-yr warranty + SLAHot-swappable modules

Explore Further

Related Resources

Frequently Asked Questions

Can an LED wall integrate with our existing AV control system?+

Yes — as on this project, the wall can be driven through your incumbent control stack (Crestron, Extron or equivalent) so operators keep their existing workflows.

What uptime can a command centre wall achieve?+

With redundant power/signal paths and hot-swappable modules, 99.9%+ is achievable. Front-serviceable panels keep repair windows to minutes, not hours.

LED or LCD for a control room?+

LED has no bezels interrupting dashboards, higher brightness, and no burn-in from static content — the three chronic LCD problems in 24/7 control rooms.

Helpful Guides & Resources

Guides & Articles

LED Displays by City